Thursday, April 10, 2008

Design 2

Design 2 , i think is the worst module that i have ever taken, very time consuming. and my team, haiz.. they are all smart ppl but the things they do are er.. rather below par.

First reactor: 30% conversion. i throw into a beaker can get more % conversion lo

Furnace: It requires a forced draft fan. The total utility for it is amazingly low, 40kW. switch on air conditioner already dunno how many watts liao... that forced draft fan which is suppose to suck contents upwards against gravity requires only 40kW. If only i can patent that fan. Many many other mistakes were discovered too which shouldnt have occur given their intelligence level. Hwa Chong JC Alumni c'mon....you guys can definitely produce much better work than this

Our total capital cost was estimated to amount 107million (expected to grow further after including waste water treatment), operating cost is at close to 25million per year. Li hai. Our hydrogen plant is just a sophisticated way to burn money i think. When i told a friend about our cost, he replied, "you all building hydrogen plant or hydrogen bomb?"


"Kaboom, goes the bomb, sorry, i mean our plant" -zh